Stock Code: 300062
The CEMS-90 Series Partial Discharge Monitoring System integrates Ultra High Frequency (UHF) and Acoustic Emission (AE) monitoring technologies to track multiple parameters within power grid equipment, including partial discharge and environmental conditions. The system is designed for precise measurements, easy installation, and minimal maintenance. It offers real-time alerts to prevent faults, improving the safety and stability of the electrical grid.
Model :
CEMS-90Capacity :
Refer to the Details PageApplications :
Substations / Smart Grids / Railway Electrical Systems / Industrial PlantsProduct Origin :
ChinaSales Type :
Retail / Wholesale / Distributor SalesCustomization :
Support
Partial Discharge Monitoring Device | ||
Operating Environment | Indoor | |
Power Supply | DC12V | |
Installation Method | Magnetic Adsorption | |
Operating Temperature | -25℃ - +65℃ | |
Operating Humidity | 5% - 95%RH | |
Ultrasonic | Center Frequency | 40kHz |
Measurement Range | 0 - 199dB | |
Resolution | ±1dB | |
Ultra-High Frequency | Frequency Range | 300MHz - 1.5GHz |
Measurement Range | 0 - 99dB | |
Resolution | ±1dB | |
Service Life | ≥10 Years | |
Ingress Protection Rating | IP55(90T1) IP65(90T2) |
|
Display Device |
||
Operating Environment | Indoor | |
Installation Method | Panel Mounting | |
Power Supply | AC/DC 110–220V | |
Operating Temperature | -25℃ - +65℃ | |
Operating Humidity | 5% - 95% RH | |
Number of Integrated Monitoring Devices | ≤6 | |
Communication Interface | RS-485 MODBUS Protocol | |
Service Life | ≥10 Years | |
Weight | 0.3kg |
Power Grid Monitoring
High-Voltage Switchgear Monitoring
Substation Equipment Monitoring
Industrial Power Systems
Renewable Energy Installations
Smart Grid Applications
Our hours
Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)