Stock Code: 300062

Infrastructure Electrical Project

  • Ceepower's Innovative Power Solutions for the Shenzhen-Zhongshan Channel
    Ceepower's Innovative Power Solutions for the Shenzhen-Zhongshan Channel
    Oct 15, 2024
    The Shenzhen-Zhongshan Channel is a groundbreaking infrastructure project that spans approximately 24 kilometers, connecting the east and west banks of the Pearl River. This major undertaking combines bridges, islands, tunnels, and underwater connections, presenting complex construction challenges and demanding high technical standards.    Reliable power supply is essential for the project's success. As a trusted supplier for the Southern Power Grid, Ceepower is providing advanced ring main units to support this world-class engineering endeavor.     Quality Service for Major Projects Ceepower's ring main units are vital for maintaining stable electricity supply. In this project, they will handle power distribution, protection, and control within an intelligent 10 kV distribution switch station. Utilizing advanced automation technology, these cabinets ensure rapid fault recovery times in the millisecond range. To further ensure smooth operation, Ceepower will provide comprehensive technical support and after-sales services.         Enhancing Distribution Network Efficiency Designed with advanced features, Ceepower’s ring main units integrate high-voltage switching, protection, control, measurement, and communication functions. Their compact design and reliability ensure stable performance in challenging environments.      In the future, Ceepower will continue to focus on the power industry, dedicated to providing high-quality power equipment and services for more major engineering projects, thereby contributing significantly to the country's infrastructure development and economic and social progress.              
    Read More

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

Our hours

Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)

Contact Us: global@ceepower.com

home

products

WhatsApp

Contact Us