Sep 30, 2024
On September 29th, the Chongqing-Yibin section of the Chongqing-Kunming High-Speed Railway officially opened. Ceepower’s subsidiary, Wuhan Wuchang Electric Control Co., Ltd., supplied 126 prefabricated substations, ensuring reliable power along the 192-kilometer route.
Designed for speeds of up to 350 km/h, this section significantly shortens travel times between major cities, reducing the journey from Chongqing to Luzhou East to just 26 minutes, and to Yibin Station in as little as 48 minutes. It enhances regional connectivity and supports the development of the Chengdu-Chongqing economic circle and the Yangtze River Economic Belt.
Ceepower’s modular, compact substations are tailored to Sichuan’s complex terrain, providing a stable power supply for the safe operation of this critical rail line.
Committed to innovation and excellence, Ceepower continues to support the expansion of China’s rail infrastructure.
Read More